Installation guide

Mounting your Lumen roof light pod

Step-by-step instructions for bonding the lamps into the roof pod, running the wiring and fitting the pod to your vehicle roof. Spread the job over two days: the lamps are bonded into the pod on day 1 and cure overnight, and the pod is fitted on day 2. Allow 24 hours for the adhesive to cure before driving.

Watch the full video guide Jump to lamp mounting Three pickups with illuminated roof light pods at night
Important: Our lamps are delivered loose. They are not pre-installed in the pod and must be bonded in place with Sikaflex before the pod is fitted to the roof. If your pod came with steel brackets, these should not be used. See step 2.

Video walkthrough

This video from 4x4AT shows the complete installation of a roof light pod on a 2023+ Ford Ranger, from preparing the pod to curing the adhesive. The steps below follow the same order, with the timestamps linked so you can jump straight to each part.

Open the video on YouTube →

Image placeholder description Watch on YouTube (46 min)

Before you start

In the box

  • Roof light pod
  • Lamps (loose)
  • Wiring loom with relay and switch feed
  • Y-split connectors
  • Rubber grommets

Tools

  • Drill with 3.5, 7.5 and 8.5 mm bits (option A)
  • Deburring tool
  • Trim removal tools
  • Tape measure and 50 mm masking tape
  • Sealant gun, knife, cable ties
  • File or grinder (option B only)

Consumables

  • Sikaflex (e.g. Sikaflex-221 or 252), black
  • Heavy-duty double-sided tape (optional, for fitting the pod to the roof)
  • Glass cleaner and brake cleaner
  • Touch-up / 2K paint for drilled holes
  • Foam pad or packing to protect the paint
  • Support blocks for positioning the lamps

Installation steps

  1. Unpack and check the contents

    Turn the box upside down before cutting it open, so a knife can't slip and scratch the painted face of the pod. Check that you have everything listed above.

    Video 2:10
  2. Bond the lamps into the roof pod (day 1)

    Our lamps are delivered loose and are bonded directly into the pod. Do this first, as the adhesive needs to cure overnight before you continue.

    Steel brackets? Don't use them. Some roof pods are delivered with steel mounting brackets. These should not be used. Follow the bonding method below for all roof pods.
    Lamp positioned in the roof pod opening, resting on a foam support block
    The lamp is built up on a support block so it sits at the right height in the opening.
    Lamp centred behind the light opening of the roof pod, seen from the front
    Seen from the front: the lamp is centred with its light source in the middle of the opening.
    1. Clean all bonding surfaces on the pod and lamps with brake cleaner and let them dry.
    2. Centre each lamp in its opening as shown in the photos. Where needed, build the lamp up with a support block so it sits at the right height.
    3. Align the light source so it is centred in the opening. Check from the front, through the light opening, that each lamp sits the way you want it.
    4. Bond the lamps firmly with a suitable adhesive, such as Sikaflex, and wipe off any excess straight away.
    5. Leave the adhesive to cure overnight before handling the pod further.

    Good to know: On some models, part of the lamp's light opening will be slightly covered by the pod. This is expected. The lamps' light openings are matched to the beam pattern, and the lamps will throw both far and wide when they are bonded fully flush with the glass.

    Finished roof pod with lamps bonded flush behind the light openings
    The finished result: lamps bonded flush with the glass. A small part of the light opening may be covered, which is expected.
  3. Secure the cables inside the pod (day 2)

    Once the adhesive has cured, connect the lamps using the Y-split connectors. Then fasten the cables inside the pod with tape or cable ties so they are neatly organised. Loose cables will vibrate and knock against the roof while driving.

    Four lamps bonded inside the roof pod with cables connected and taped down
    Lamps bonded in place, with the cables joined and taped down inside the pod.
    Video 2:50
  4. Choose how to route the cable out of the pod

    There are two ways to get the cable from the pod into the vehicle:

    Option A

    Through the roof

    Many choose to drill through the roof, as shown in the installation video. The holes are hidden under the pod and sealed with grommets and Sikaflex. Follow all the steps below.

    Option B

    Along the A-pillar

    If you'd rather not drill the roof, you can route the cable down along the A-pillar. Grind away a small part of the pod's profile where it rests against the roof, so the cable can exit between the roof and the pod.

    We recommend the Lumen A-pillar trim (14900) to hide the cable along the windscreen and down to the engine bay. With this option, skip the roof drilling and sealing in steps 6, 7 and 9.

    Small notch ground into the roof pod profile so the cable can exit between the roof and the pod
    Option B: a small notch ground into the profile lets the cable exit between the roof and the pod.
    Roof pod fitted on the roof with the cable exiting at the side of the pod
    Option B fitted: the cable exits at the side of the pod, with no holes drilled in the roof.
  5. Remove the interior trim and protect the cabin

    Remove the sun visors, grab handles and A-pillar trims, and lower the front of the headlining. Lay a protective sheet over the seats and carpets to catch swarf if you are drilling.

    Video 4:38
  6. Clean and measure the roof Option A

    Clean the roof with glass cleaner, then brake cleaner, to remove all oil and dirt. Mark the two cable holes with masking tape. On the 2023+ Ford Ranger in the video they sit 85 mm back from the front edge of the roof and 555 mm in from each roof rail. Check the measurements for your vehicle, and make sure the holes will be hidden under the pod.

    Video 6:28
  7. Drill and paint the holes Option A

    Check there is nothing behind the roof skin. Drill in stages: 3.5 mm, then 7.5 mm, then 8.5 mm. Deburr the holes so the edges can't cut the grommets, then vacuum away all swarf. Paint the bare metal inside and out to prevent rust, and let it dry while you do the wiring.

    Video 9:11
  8. Run the wiring loom

    Prepare the loom, connect it to the high-beam signal inside the cabin, and pass the power feed through to the engine bay. Connect to the battery, ground it to a clean earth point and secure the loom away from heat and moving parts. With option A, route the cable up the A-pillar and across under the headlining to the roof holes. With option B, run it along the outside of the A-pillar under the A-pillar trim.

    Video 12:26 – 33:47
  9. Fit the grommets and seal the holes Option A

    Push the rubber grommets into the holes at an angle, then feed one cable through each hole. Fill the holes and build a small mound of Sikaflex around the cables on the outside, and seal around the grommets on the inside too. Mist with glass cleaner and smooth the sealant with a gloved finger.

    Video 33:47
  10. Refit the interior trim

    Trim the A-pillar trim if needed to clear the cable, then refit the headlining, handles, visors and pillar trims.

    Video 37:22
  11. Mark the pod position

    Mark a line 50 mm back from the front edge of the roof: this is where the front of the pod sits. Keep a gap of roughly 10 mm (about a finger's width) to the roof rail on each side. Getting this right keeps the beam level, so it doesn't point at the sky or the road.

    Video 39:09
  12. Bond the pod to the roof

    Run a bead of Sikaflex around the pod, keeping to the inside edge so it doesn't squeeze out when pressed down. Leave a small gap at the lowest point so any water that gets in can drain out. Lay the pod face-down on foam on the roof, plug in the connectors, and test all the lamps (ignition on, high beam on). With a helper, flip the pod into position, check no cables are trapped underneath and press it down evenly.

    Alternative to Sikaflex

    Heavy-duty double-sided tape

    Instead of bonding the pod with Sikaflex, you can fit it to the roof with strong double-sided mounting tape. Apply the tape to clean, dry surfaces and press the pod down firmly. We then recommend running an adhesive sealant bead along the outer edges of the pod, such as black Sikaflex. It gives a neater finish and extra security. Leave a small gap at the lowest point so water can drain out.

    Video 41:54
  13. Clean up and cure

    Tape the pod in place while it cures. Wipe off any sealant that squeezed out with brake cleaner and a microfibre cloth. It is much easier now than once it has cured. Leave the vehicle for 24 hours before driving.

    Video 43:32

Final checklist

  • All lamps are centred, bonded flush with the glass and cured overnight (no steel brackets used)
  • Cables inside the pod are organised and secured against vibration
  • Option A: roof holes are deburred, painted, fitted with grommets and sealed inside and out
  • Option B: the cable exits through the ground notch and is hidden under the A-pillar trim
  • The pod sits 50 mm from the front edge with an even gap to both roof rails
  • A drainage gap has been left in the adhesive bead or edge seal
  • All lamps switch on with the high beam
  • The adhesive has cured for 24 hours before driving

Need help with your installation?